L9 and L10
Construction work is taking place currently on L9/L10, which will run from Badalona and Santa Coloma de Gramenet to the Zona Franca district and El Prat International Airport. The lines, which share a central section between Bon Pastor and Torrassa (L1), will be one of the longest automated metro lines in Europe, at 47.8 kilometres (29.7 mi), and will have 52 stations. As of June 2010, eleven stations are open. The project was approved in 2000 but has been challenged by some technical difficulties and some of their sections are pending further geological analysis.
Read more about this topic: Barcelona Metro
Related Phrases
Related Words