The closure of the canal north of Snarestone in 1966 led to the formation of the Ashby Canal Association, to ensure that no more was closed and to work towards the reopening of the northern section. In 1992, the engineering consultants W. S. Atkins produced a feasibility study for the restoration of the canal between Snarestone and Moira, which concluded that there were no obstacles which could not be resolved. They also recommended that the reconstruction should be suitable for broad-beam boats, rather than 7-foot (2.1 m) narrow boats, as this would have ecological advantages. By 1997, Leicestershire County Council had bought much of the route, and had located two funding packages worth over £1 million. However, they failed to reach agreement with one landowner over the purchase of a parcel of land, and because the deadlines were not met, the funding was lost. They therefore resolved to obtain an order under the Transport and Works Act 1992, which would allow them to use compulsory purchase powers if necessary. In order to promote and assist the restoration of the canal north of Snarestone, the Ashby Canal Trust was set up in 2000. It is a limited company, with directors representing the Ashby Canal Association, British Waterways, Hinckley and Bosworth Borough Council, the Inland Waterways Association, Leicestershire County Council and North West Leicestershire District Council.
Since the mining industry in the area has ceased, there have been fewer problems with subsidence, and the current plans are to re-open the canal to the National Forest visitor centre at Moira, about 1 mile (1.6 km) short of its original terminus at Spring Cottage. Between 1999 and 2005, a stretch of the canal near Moira was restored and re-filled with water, passing the historic Moira Furnace, a blast furnace from the 19th century which has been converted to provide visitor facilities including a craft centre, museum and cafe. The restored stretch is some 1.5 miles (2.4 km) long, and includes a new lock built to overcome the problems caused by mining subsidence. Below the restored section, the way forward has been blocked by the construction of the A42 main road across the canal's formation. In November 2004, a public enquiry was held in connection with the application for a Transport and Works Order. Most objections were withdrawn, leaving one from English Nature, which was accommodated by including a provision for off-line nature reserves, and the Order was granted in October 2005.
The Order allows Leicestershire County Council to purchase land and construct 2.5 miles (4 km) of canal from Snarestone to Measham. Initially, this will follow the original route, but will diverge near Measham, to use the track of a redundant railway. The new canal will pass through Measham Station and cross the High Street on an aqueduct. The Transport and Works Act Order was introduced by the British Parliament in 1992 as a way of simplifying the legal processes for railway and canal projects, and works which interfere with navigation rights. Although a number of railway projects had previously been authorised under this legislation, the Ashby Canal Order obtained by Leicestershire County Council was the first time that construction of a canal had been authorised in this way. Purchase of the land between Snarestone and Measham had been completed by 2010. Re-construction of the first 100 yards (91 m) of the infilled section began on 26 February 2009, after a grant from the East Midlands Development Agency was secured. The £0.5 million project involved the provision of a stop lock, a new slipway, an improved winding hole and a wetland nature reserve, running parallel to the canal and connected to it. The stop lock chamber marks the division between the part of the canal owned by British Waterways, and that owned by Leicestershire County Council, although no gates have been fitted while the length of canal beyond the chamber is short.
On 23 June 2011, Leicestershire County Council reached agreement with UK Coal for them to extract coal and fireclay at their Minorca Opencast site near Measham. As part of the planning gain, UK Coal will alter Gallows Lane to allow the new canal to pass under it, will provide a water storage lake, reducing the cost of the next phase by £1 million, and will provide £1.28 million to fund the reconstruction of the section north of Snarestone. They will also make available any clay removed from the site which is suitable for puddling the new section of waterway.
Read more about this topic: Ashby Canal
Famous quotes containing the word restoration:
“In comparison to the French Revolution, the American Revolution has come to seem a parochial and rather dull event. This, despite the fact that the American Revolution was successfulrealizing the purposes of the revolutionaries and establishing a durable political regimewhile the French Revolution was a resounding failure, devouring its own children and leading to an imperial despotism, followed by an eventual restoration of the monarchy.”
—Irving Kristol (b. 1920)
“I claim that in losing the spinning wheel we lost our left lung. We are, therefore, suffering from galloping consumption. The restoration of the wheel arrests the progress of the fell disease.”
—Mohandas K. Gandhi (18691948)
“Men who are occupied in the restoration of health to other men, by the joint exertion of skill and humanity, are above all the great of the earth. They even partake of divinity, since to preserve and renew is almost as noble as to create.”
—Voltaire [François Marie Arouet] (16941778)