Almaty Metro - System

System

Upon completion, the metro system will total 45 km in length.

The first section of Line 1 has a length of 8.56 km and seven stations (four deep-level stations and three sub-surface stations). 7 trains operate on the first line. The construction cost is estimated at 101 billion tenge ($1 billion).

The metro will expand in the future. Construction of Sairan and Molodejnaya stations started in 2011.

Read more about this topic:  Almaty Metro

Famous quotes containing the word system:

    “It is not easy to construct by mere scientific synthesis a foolproof system which will lead our children in a desired direction and avoid an undesirable one. Obviously, good can come only from a continuing interplay between that which we, as students, are gradually learning and that which we believe in, as people.”
    —Erik H. Erikson (20th century)

    “Never expect any recognition here—the system prohibits it. The cross is not affixed to the genius, no, the genius is affixed to the cross.”
    —Franz Grillparzer (1791–1872)

    “Ethics and religion differ herein; that the one is the system of human duties commencing from man; the other, from God. Religion includes the personality of God; Ethics does not.”
    —Ralph Waldo Emerson (1803–1882)