Almaty Metro - System

System

Upon completion, the metro system will total 45 km in length.

The first section of Line 1 has a length of 8.56 km and seven stations (four deep-level stations and three sub-surface stations). 7 trains operate on the first line. The construction cost is estimated at 101 billion tenge ($1 billion).

The metro will expand in the future. Construction of Sairan and Molodejnaya stations started in 2011.

Read more about this topic:  Almaty Metro

Famous quotes containing the word system:

    Each generation’s job is to question what parents accept on faith, to explore possibilities, and adapt the last generation’s system of values for a new age.
    Frank Pittman (20th century)

    Social and scientific progress are assured, sir, once our great system of postpossession payments is in operation, not the installment plan, no sir, but a system of small postpossession payments that clinch the investment. No possible rational human wish unfulfilled. A man with a salary of fifty dollars a week can start payments on a Rolls-Royce, the Waldorf-Astoria, or a troupe of trained seals if he so desires.
    John Dos Passos (1896–1970)

    Human beings are compelled to live within a lie, but they can be compelled to do so only because they are in fact capable of living in this way. Therefore not only does the system alienate humanity, but at the same time alienated humanity supports this system as its own involuntary masterplan, as a degenerate image of its own degeneration, as a record of people’s own failure as individuals.
    Václav Havel (b. 1936)