Almaty Metro - System

System

Upon completion, the metro system will total 45 km in length.

The first section of Line 1 has a length of 8.56 km and seven stations (four deep-level stations and three sub-surface stations). 7 trains operate on the first line. The construction cost is estimated at 101 billion tenge ($1 billion).

The metro will expand in the future. Construction of Sairan and Molodejnaya stations started in 2011.

Read more about this topic:  Almaty Metro

Famous quotes containing the word system:

    Never expect any recognition here—the system prohibits it. The cross is not affixed to the genius, no, the genius is affixed to the cross.
    Franz Grillparzer (1791–1872)

    Each generation’s job is to question what parents accept on faith, to explore possibilities, and adapt the last generation’s system of values for a new age.
    Frank Pittman (20th century)

    A system of morality which is based on relative emotional values is a mere illusion, a thoroughly vulgar conception which has nothing sound in it and nothing true.
    Socrates (469–399 B.C.)