Almaty Metro - System

System

Upon completion, the metro system will total 45 km in length.

The first section of Line 1 has a length of 8.56 km and seven stations (four deep-level stations and three sub-surface stations). 7 trains operate on the first line. The construction cost is estimated at 101 billion tenge ($1 billion).

The metro will expand in the future. Construction of Sairan and Molodejnaya stations started in 2011.

Read more about this topic:  Almaty Metro

Famous quotes containing the word system:

    Such is the remorseless progression of human society, shedding lives and souls as it goes on its way. It is an ocean into which men sink who have been cast out by the law and consigned, with help most cruelly withheld, to moral death. The sea is the pitiless social darkness into which the penal system casts those it has condemned, an unfathomable waste of misery. The human soul, lost in those depths, may become a corpse. Who shall revive it?
    Victor Hugo (1802–1885)

    Each generation’s job is to question what parents accept on faith, to explore possibilities, and adapt the last generation’s system of values for a new age.
    Frank Pittman (20th century)

    I candidly confess that I have ever looked on Cuba as the most interesting addition which could ever be made to our system of States. The control which, with Florida, this island would give us over the Gulf of Mexico, and the countries and isthmus bordering on it, as well as all those whose waters flow into it, would fill up the measure of our political well-being.
    Thomas Jefferson (1743–1826)