Deployment in Great Britain
Task Force #38 left 6 August 1942 bound for Greenock, Scotland in the British Isles with the USS Arkansas (BB-33) as flagship, fourteen destroyers as escorts with twelve transports including USAT Argentina, carrying the 332nd. The convoy arrived there 17 August 1942.
Upon reaching Scotland, 332nd travelled by rail to their first destination, Newport.
The 332nd initially was involved to build bases for the coming troops in preparation for the North Africa campaign and D-Day in World War II.
In their first 1–2 months they built base camps for the Regiment, first from tents but eventually to more permanent Nissen huts. Training was conducted on how to build Bailey Bridges. A depot was constructed at Thatcham. This depot was designed as a staging area for the American Army for assembly and shipping of equipment, supplies and gear to the western and northern ports of Britain, where ships were loaded for North Africa.
Read more about this topic: 332nd Engineer General Service Regiment (United States)
Famous quotes containing the word britain:
“The proposition that Muslims are welcome in Britain if, and only if, they stop behaving like Muslims is a doctrine which is incompatible with the principles that guide a free society.”
—Roy Hattersley (b. 1932)