EVAs
Start Date/Time | Duration | End Time | Spacecraft | Crew | Function | Remarks |
---|---|---|---|---|---|---|
30 January 09:56 |
7 hours 10 minutes |
17:06 | Expedition 16 (ISS Quest) |
Peggy Whitson Daniel M. Tani |
Replace motor and bearing in solar array joint | |
11 February 14:13 |
7 hours 58 minutes |
22:11 | STS-122 (ISS Quest) |
Rex J. Walheim Stanley G. Love |
Install Power Data Grapple Fixture on Columbus | Originally to have been conducted by Walheim and Hans Schlegel, Love replaced Schlegel on medical grounds. |
13 February 14:27 |
6 hours 45 minutes |
21:12 | STS-122 (ISS Quest) |
Rex J. Walheim Hans Schlegel |
Replace depleted nitrogen tank | |
15 February 12:07 |
7 hours 25 minutes |
20:32 | STS-122 (ISS Quest) |
Rex J. Walheim Stanley G. Love |
Install experiments on Columbus, load failed gyroscope onto Shuttle for return to Earth | |
14 March 01:18 |
7 hours 1 minute |
08:19 | STS-123 (ISS Quest) |
Richard M. Linnehan Garrett Reisman |
Install Kibo ELM-PS and start Dextre assembly | |
15 March 23:49 |
7 hours 8 minutes |
16 March 06:57 |
STS-123 (ISS Quest) |
Richard M. Linnehan Michael Foreman |
Dextre assembly | |
17 March 22:52 |
6 hours 53 minutes |
18 March 05:44 |
STS-123 (ISS Quest) |
Richard M. Linnehan Robert L. Behnken |
Dextre assembly, install MISSE-6 experiment, and store spare parts outside the ISS | MISSE installation failed |
20 March 22:04 |
6 hours 24 minutes |
21 March 04:08 |
STS-123 (ISS Quest) |
Robert L. Behnken Michael Foreman |
Test heat shield repair techniques | |
22 March 20:34 |
6 hours 2 minutes |
23 March 02:36 |
STS-123 (ISS Quest) |
Robert L. Behnken Michael Foreman |
Store OBSS on ISS, retry MISSE-6 installation | |
3 June 16:22 |
6 hours 48 minutes |
23:10 | STS-124 (ISS Quest) |
Mike Fossum Ron Garan |
Install JEM Pressurised Module, Inspect SARJ, retrieve OBSS. | |
5 June 15:04 |
7 hours 11 minutes |
22:15 | STS-124 (ISS Quest) |
Mike Fossum Ron Garan |
Adjust covers on JEM, Inspect SARJ. | |
8 June 13:55 |
6 hours 33 minutes |
20:28 | STS-124 (ISS Quest) |
Mike Fossum Ron Garan |
Replace nitrogen tank, inspect SARJ. | |
10 July 18:48 |
6 hours 18 minutes |
11 July 01:06 |
Expedition 17 (ISS Pirs) |
Sergei Volkov Oleg Kononenko |
Remove pyrotechnic bolt from Soyuz TMA-12 for inspection. | |
15 July 17:08 |
5 hours 54 minutes |
23:02 | Expedition 17 (ISS Pirs) |
Sergei Volkov Oleg Kononenko |
Install docking targeting equipment, rotate exposed experiments | |
27 September 08:38 |
22 minutes | 09:00 | Shenzhou 7 | Zhai Zhigang (full) Liu Boming (stand-up) |
Test spacesuit, collect experiment | First Chinese EVA |
18 November 18:09 |
6 hours 52 minutes |
19 November 01:01 |
STS-126 (ISS Quest) |
Heidemarie Stefanyshyn-Piper Stephen G. Bowen |
Transferred an empty nitrogen tank assembly from ESP3 to the shuttle's cargo bay, transferred a new flex hose rotary coupler to ESP3 for future use, removed an insulation cover on the Kibo Exposed Facility berthing mechanism, began cleaning and lubrication of the starboard SARJ, and replacement of its 11 trundle bearing assemblies. | |
20 November 17:58 |
6 hours 45 minutes |
21 November 00:43 |
STS-126 (ISS Quest) |
Heidemarie Stefanyshyn-Piper Robert S. Kimbrough |
Relocated the two CETA carts from the starboard side of the Mobile Transporter to the port side, lubricated the station robotic arm's latching end effector A snare bearings, continued cleaning and lubrication of the starboard SARJ | Conducted on tenth anniversary of the launch of the ISS |
22 November 18:01 |
6 hours 57 minutes |
23 November 00:58 |
STS-126 (ISS Quest) |
Heidemarie Stefanyshyn-Piper Stephen G. Bowen |
Completed cleaning and lubrication of all but one of the trundle bearing assemblies (TBA) on the starboard SARJ. | |
24 November 18:24 |
6 hours 7 minutes |
25 November 00:31 |
STS-126 (ISS Quest) |
Stephen G. Bowen Robert S. Kimbrough |
Completed replacement of trundle bearing assemblies on starboard SARJ, lubricated the port SARJ, installed a video camera, reāinstalled insulation covers on the Kibo External Facility berthing mechanism, performed Kibo robotic arm grounding tab maintenance, installed spacewalk handrails on Kibo, installed Global Positioning Satellite (GPS) antennae on Kibo, photographed radiators, and photographed trailing umbilical system cables. | |
23 December 00:51 |
5 hours 38 minutes |
06:29 | Expedition 18 (ISS Pirs) |
Michael Fincke Yuri Lonchakov |
Install Langmuir probe, EXPOSE-R and IPI-SM experiments. | EXPOSE-R installation failed |
Read more about this topic: 2008 In Spaceflight
Related Phrases
Related Words