EVAs
Start Date/Time | Duration | End Time | Spacecraft | Crew | Function | Remarks |
---|---|---|---|---|---|---|
15 January 12:50 |
6 hours 51 minutes |
19:41 | Expedition 6 ISS Quest |
Kenneth Bowersox Donald Pettit |
Released the remaining launch locks on the P1 radiator assembly, removed debris on a sealing ring of Unity's docking port, and tested an ammonia reservoir on the station's P6 truss. | |
8 April 12:40 |
6 hours 26 minutes |
19:06 | Expedition 6 ISS Quest |
Kenneth Bowersox Donald Pettit |
Reconfigured cables on the S0 (S-Zero), S1 and P1 trusses, replaced a Power Control Module on the Mobile Transporter, installed Spool Positioning Devices on Destiny, and reinstalled a thermal cover on an S1 Radiator Beam Valve Module. |
Read more about this topic: 2003 In Spaceflight