2003 in Spaceflight - EVAs

EVAs

Start Date/Time Duration End Time Spacecraft Crew Function Remarks
15 January
12:50
6 hours
51 minutes
19:41 Expedition 6
ISS Quest
Kenneth Bowersox
Donald Pettit
Released the remaining launch locks on the P1 radiator assembly, removed debris on a sealing ring of Unity's docking port, and tested an ammonia reservoir on the station's P6 truss.
8 April
12:40
6 hours
26 minutes
19:06 Expedition 6
ISS Quest
Kenneth Bowersox
Donald Pettit
Reconfigured cables on the S0 (S-Zero), S1 and P1 trusses, replaced a Power Control Module on the Mobile Transporter, installed Spool Positioning Devices on Destiny, and reinstalled a thermal cover on an S1 Radiator Beam Valve Module.

Read more about this topic:  2003 In Spaceflight